    Heating inspections: duties, deadlines and owner costs

    German heating inspections under section 60b: covered systems, the September 2027 deadline, optimisation, documentation and landlord cost planning.


    Investment Advisor at InvestImmo
    18 November 20268 min read

    The heating works, so why commission an additional appointment? Routine servicing does not automatically cover every statutory efficiency check. Investors should know the installation date, inspection findings and outstanding work before costs or missed deadlines arise.

    01Which systems are covered?

    Section 60b GModG focuses on the water-based system and independent units in the building, not just your flat. Heat pumps have separate provisions under section 60a. A single-family home is therefore not automatically subject to the same duty as a large apartment building.

    Where the system is common property, the owners’ association must organise responsibility and commissioning. Have individual-flat systems, contracting arrangements and unusual structures assessed professionally. A contract’s title alone does not reliably establish an exemption.

    02Calculate the deadline correctly

    Deadlines in section 60b(1)
    InstallationInspection deadline
    Before 1 October 2009By the end of 30 September 2027
    After 30 September 2009Within one year after reaching 15 years

    An illustrative system installed in March 2012 reaches 15 years in March 2027. Inspection is required within the following year. This is not a duty to replace the complete heating system.

    03What the qualified professional examines

    The law covers efficient heat-generation settings, the heating pump, insulation of pipes and fittings, and opportunities to reduce flow temperature. Optimisation must respect health protection and building integrity.

    Commissioning and documentation
    1. 01
      Collect system records:

      establish installation date, type and existing reports.

    2. 02
      Confirm applicability:

      a suitable qualified professional assesses the legal classification.

    3. 03
      Specify the instruction:

      commission the relevant statutory inspection, not just ordinary servicing.

    4. 04
      Request written findings:

      record results and required optimisation.

    5. 05
      Monitor implementation:

      the optimisation covered by section 60b(5) must be implemented and documented within one year.

    The law seeks to combine the check with scheduled work such as servicing or a chimney-sweep inspection where possible. That can help organisation, but it does not guarantee a particular saving.

    04Inspection, balancing and heat pumps differ

    Hydraulic balancing under section 60c GModG concerns the installation of water-based systems covered there in buildings with six or more units. It is not a blanket retrofit obligation for every existing system. Suitable evidence may replace an inspection in a particular case.

    Heat pumps fall under section 60a GModG. Do not confuse their operational checks with the deadline for older other systems. Determine exemptions, remote monitoring and equivalent evidence from the actual installation.

    Professional inspection of a heating installation
    AI-generated illustrative image

    05Budget costs and tenant charges cautiously

    There is no statutory fixed price. Obtain separate quotations for inspection, settings, replacement parts and additional works. Illustrative assumption: the association commissions €2,000 of work and your cost share is one eighth. Your unit’s share is €250. This is neither a market price nor a binding cost allocation.

    Allocation depends on community rules and resolutions. Passing costs to tenants is not automatic: section 2 BetrKV distinguishes recurring operating expenses from maintenance. Do not automatically classify a one-off check and construction work as recurring servicing.

    06Before buying or attending the owners’ meeting

    Request the installation date, previous inspections, professional reports, resolutions and funding arrangements. A low purchase price is less helpful if outstanding duties and weak reserves are omitted. Check that any existing report actually satisfies the statutory requirements.

    FAQFrequently asked questions

    Which buildings are covered?

    Section 60b covers specified water-based systems in buildings with at least six dwellings or independent units. Heat pumps have separate rules.

    What deadline applies to older systems?

    For covered systems installed before 1 October 2009, section 60b specifies 30 September 2027. Later systems must be inspected within one year after reaching 15 years.

    Does this automatically require replacement?

    No. Inspection and optimisation are not the same as replacement of the entire system.

    Can all costs be charged to tenants?

    Not automatically. Recurring operating expenses must be distinguished from one-off checks and maintenance.

    07Further reading

    08Sources

    Section 60b GModG, section 60a GModG, section 60c GModG, section 2 BetrKV. Section 60b deadlines and scope were checked against the official search extract; direct access was unavailable during this review.

    Revision: 18 November 2026. General information about Germany, not individual legal, tax or technical advice. Cost example is explicitly assumed. Sources are German.

    Written by
    Investment Advisor at InvestImmo

    Writes about Letting, Service charges (Nebenkosten), Tenancy law and Multi-family buildings.

    As a civil engineer, property investor and advisor with around 14 years of finance practice, Moe looks at buildings from a technical angle first. He writes about build quality, letting, running costs (Nebenkosten) and investments that hold up beyond the brochure.

    This guide does not replace tax or legal advice. All figures are example calculations with disclosed assumptions.

    Free · Instant · No sign-up

    Download this guide as a PDF

    The complete guide as a clean A4 file – with a cover page, all chapters and page numbers. Keep it on hand, read it offline, or go through it at your own pace during your consultation.

    • All chapters, tables and worked examples
    • Read offline – on your phone or printed out
    • Go through it at your own pace or pass it on
    • Free, no sign-up, no email required

    A4 format · 893 words · As of 18 November 2026

    Related guides

    All guides