Heating inspections: duties, deadlines and owner costs
German heating inspections under section 60b: covered systems, the September 2027 deadline, optimisation, documentation and landlord cost planning.
The heating works, so why commission an additional appointment? Routine servicing does not automatically cover every statutory efficiency check. Investors should know the installation date, inspection findings and outstanding work before costs or missed deadlines arise.
01Which systems are covered?
Section 60b GModG focuses on the water-based system and independent units in the building, not just your flat. Heat pumps have separate provisions under section 60a. A single-family home is therefore not automatically subject to the same duty as a large apartment building.
Where the system is common property, the owners’ association must organise responsibility and commissioning. Have individual-flat systems, contracting arrangements and unusual structures assessed professionally. A contract’s title alone does not reliably establish an exemption.
02Calculate the deadline correctly
| Installation | Inspection deadline |
|---|---|
| Before 1 October 2009 | By the end of 30 September 2027 |
| After 30 September 2009 | Within one year after reaching 15 years |
An illustrative system installed in March 2012 reaches 15 years in March 2027. Inspection is required within the following year. This is not a duty to replace the complete heating system.
03What the qualified professional examines
The law covers efficient heat-generation settings, the heating pump, insulation of pipes and fittings, and opportunities to reduce flow temperature. Optimisation must respect health protection and building integrity.
- 01Collect system records:
establish installation date, type and existing reports.
- 02Confirm applicability:
a suitable qualified professional assesses the legal classification.
- 03Specify the instruction:
commission the relevant statutory inspection, not just ordinary servicing.
- 04Request written findings:
record results and required optimisation.
- 05Monitor implementation:
the optimisation covered by section 60b(5) must be implemented and documented within one year.
The law seeks to combine the check with scheduled work such as servicing or a chimney-sweep inspection where possible. That can help organisation, but it does not guarantee a particular saving.
04Inspection, balancing and heat pumps differ
Hydraulic balancing under section 60c GModG concerns the installation of water-based systems covered there in buildings with six or more units. It is not a blanket retrofit obligation for every existing system. Suitable evidence may replace an inspection in a particular case.
Heat pumps fall under section 60a GModG. Do not confuse their operational checks with the deadline for older other systems. Determine exemptions, remote monitoring and equivalent evidence from the actual installation.

05Budget costs and tenant charges cautiously
There is no statutory fixed price. Obtain separate quotations for inspection, settings, replacement parts and additional works. Illustrative assumption: the association commissions €2,000 of work and your cost share is one eighth. Your unit’s share is €250. This is neither a market price nor a binding cost allocation.
Allocation depends on community rules and resolutions. Passing costs to tenants is not automatic: section 2 BetrKV distinguishes recurring operating expenses from maintenance. Do not automatically classify a one-off check and construction work as recurring servicing.
06Before buying or attending the owners’ meeting
Request the installation date, previous inspections, professional reports, resolutions and funding arrangements. A low purchase price is less helpful if outstanding duties and weak reserves are omitted. Check that any existing report actually satisfies the statutory requirements.
FAQFrequently asked questions
Which buildings are covered?
Section 60b covers specified water-based systems in buildings with at least six dwellings or independent units. Heat pumps have separate rules.
What deadline applies to older systems?
For covered systems installed before 1 October 2009, section 60b specifies 30 September 2027. Later systems must be inspected within one year after reaching 15 years.
Does this automatically require replacement?
No. Inspection and optimisation are not the same as replacement of the entire system.
Can all costs be charged to tenants?
Not automatically. Recurring operating expenses must be distinguished from one-off checks and maintenance.
07Further reading
08Sources
Section 60b GModG, section 60a GModG, section 60c GModG, section 2 BetrKV. Section 60b deadlines and scope were checked against the official search extract; direct access was unavailable during this review.
Revision: 18 November 2026. General information about Germany, not individual legal, tax or technical advice. Cost example is explicitly assumed. Sources are German.

Writes about Letting, Service charges (Nebenkosten), Tenancy law and Multi-family buildings.
As a civil engineer, property investor and advisor with around 14 years of finance practice, Moe looks at buildings from a technical angle first. He writes about build quality, letting, running costs (Nebenkosten) and investments that hold up beyond the brochure.
This guide does not replace tax or legal advice. All figures are example calculations with disclosed assumptions.