    iSFP Renovation Roadmap: Costs and Value for Landlords

    Separate advisory grants, construction support and owner contributions—with a worked example for a six-apartment building.


    Investment Advisor at InvestImmo
    3 November 202610 min read
    Illustrative assumptions: a renovation roadmap for six apartments
    €2,200
    assumed total fee including presentation
    not a market quotation or offer
    €1,100
    assumed cost after advisory grants
    eligibility requirements satisfied
    €112,333
    calculated break-even expenditure excluding the extra bonus
    conservative comparison
    €1,317
    benefit per apartment at €150,000 eligible expenditure
    including the bonus, before tax

    Illustrative starting point: Your Eigentümerversammlung, the apartment owners’ meeting, is considering an individueller Sanierungsfahrplan for a total fee of €2,200. Some owners ask why they should pay for planning when no renovation has been approved.

    The important question is not simply how much of the advisory fee is subsidised. Consider which works are actually needed, which expenditure qualifies and whether the owners can finance implementation. The calculation below separates planning costs, higher eligible-expenditure limits and the additional bonus.

    01What an individual renovation roadmap provides

    The iSFP is intended to set out a coherent route towards improving a building’s energy performance. Rather than treating individual works in isolation, it proposes coordinated measures and their sequence. Alternatively, it can examine a comprehensive renovation to an Effizienzhaus standard. The BAFA funding guide describes these alternatives.

    Ask the adviser’s quotation to identify the building components and systems covered, the calculations included and how costs and energy savings will be presented. Specifically request the assumptions concerning occupancy, energy prices and construction specifications. Do not treat calculated savings as a promise about your actual future bills.

    For an owners’ association, the proposed sequence is particularly useful: which works should be planned together, what can wait and which decision must come first? Use the roadmap to structure these questions rather than as a substitute for detailed contractor quotations.

    Apartment building with a heat pump during an energy assessment
    AI-generated illustrative image

    02Fees and advisory grants

    Obtain a quotation for the specific property. Check whether the site assessment, report, explanation, VAT and presentation at the Eigentümerversammlung are included in the total. The fee used below is expressly not a statement about typical market pricing.

    The published residential energy-advice funding conditions provide the following contributions.

    Advisory fundingContribution or limit
    Eligible advisory fee50%
    One- or two-family houseMaximum €650
    Residential building with at least three apartmentsMaximum €850
    Additional explanation at the owners’ meetingOne-off contribution of up to €250

    Application and eligibility. Apply before the advisory work begins. According to the federal funding database, the building application or building notification must generally date back at least ten years. Repeat funding for the same building is generally possible no earlier than four years after the previous grant was paid, with an exception for an intervening ownership change. The adviser must have the appropriate entry in the Energieeffizienz-Expertenliste.

    During an acquisition. Do not assume that merely being interested in buying establishes eligibility. Before commissioning the advice, clarify the required stage of acquisition and the evidence needed for your particular application. You can still request existing documents from the seller beforehand.

    Payment and liquidity. Ask for a written explanation of the current process, including authorisation, invoicing, the Verwendungsnachweis documenting use of the funds, and the payment recipient. Plan liquidity cautiously: an expected grant is not the same as money already available in your account.

    Tax treatment. The investment comparison below is before tax. It does not promise that every euro of the owner’s contribution is immediately deductible as Werbungskosten, expenses associated with rental income. Obtain individual advice, particularly where the planning relates to an acquisition or construction works.

    03How the roadmap affects renovation funding

    For the building-envelope measures considered here, basic support is 15%. The BMWE information on changes from 21 July 2026 describes an additional five-percentage-point iSFP bonus only on expenditure above the applicable minimum investment threshold. That threshold must be met within the individual application; separate applications are not added together for this purpose.

    Eligible-expenditure limits for building-envelope measures
    Apartment counted towards the building limitWithout the iSFP increaseWith a qualifying iSFP increase
    First€30,000€60,000
    Second to sixth, each€15,000€30,000
    Seventh onwards, each€8,000€15,000

    The increase is therefore not a doubling throughout the entire scale. The funding conditions and allocation of expenditure to the application are decisive. Source: BMWE BEG FAQs.

    If the measure affects only some apartments, the applicable expenditure ceiling must be allocated proportionately to those apartments.

    The calculations below assume that the measures qualify for the iSFP advantages and that the expenditure limits remain fully available. Do not transfer this building-envelope calculation to a heating replacement or an Effizienzhaus project. Those require a separate programme assessment.

    Other possible grant components are not included in this calculation. Before applying, check the conditions applicable to your project and do not treat unconfirmed grants as secured financing.

    For a broader programme overview, see energy renovation funding for landlords.

    04Calculation: when the roadmap covers its cost

    Illustrative assumptions, not a market forecast or offer: The building has six apartments. The total fee is €2,200, comprising €1,950 for the advice and €250 for a separately identified presentation at the owners’ meeting. The calculation assumes an €850 advisory grant and full funding of the additional presentation. The remaining owner contribution is €1,100, or €183.33 per apartment under an assumed equal allocation.

    All construction expenditure below is fully eligible and included in one application. Previous applications have not used any of the limits. Technical and other funding requirements are met. Additional professional services, financing costs, taxes and differences in payment timing are excluded.

    For six apartments, the graduated limits produce €105,000 without and €210,000 with the iSFP increase. We retain the original conservative comparison excluding the additional bonus and also show the result including the bonus on expenditure above the threshold.

    Illustrative calculation: grants and remaining benefit
    Eligible expenditureWithout iSFPWith iSFP, basic support onlyBenefit after €1,100 roadmap cost, excluding bonusWith iSFP including bonusBenefit after roadmap cost, including bonus
    €80,000€12,000€12,000−€1,100€12,000−€1,100
    €120,000€15,750€18,000+€1,150€18,750+€1,900
    €150,000€15,750€22,500+€5,650€24,750+€7,900
    €210,000€15,750€31,500+€14,650€36,750+€19,900

    Author’s calculation using the assumptions immediately above. The column excluding the bonus is deliberately a partial comparison, not a statement of the entire potential grant.

    Illustrative break-even calculation: Excluding the additional bonus, the calculation is €105,000 + €1,100 ÷ 15% = €112,333.33. Including the additional five percentage points on expenditure above the threshold, it becomes €105,000 + €1,100 ÷ 20% = €110,500. Only above the respective threshold does this model produce a positive additional grant benefit after the roadmap cost.

    Illustrative assumptions: benefit per apartment including bonus
    €80,000 expenditure
    −€183 per apartment
    €120,000 expenditure
    +€317 per apartment
    €150,000 expenditure
    +€1,317 per apartment
    €210,000 expenditure
    +€3,317 per apartment
    Rounded figures; six equal cost shares, additional grant less €1,100 roadmap cost. Not an investment-return calculation or a funding commitment.

    These thresholds do not apply to every building. A higher advisory fee, ineligible works or a different application structure changes the outcome. Moreover, the comparison measures only the additional grant. Whether the renovation itself makes economic sense is a separate assessment.

    Illustrative tax sensitivity: At a purely assumed marginal tax rate of 42%, an immediately deductible €183.33 cost share would mathematically correspond to €77 of tax relief. This is not a statement of actual tax savings: deductibility, grant treatment and timing have not been assessed. No particular income level is therefore assigned a blanket tax rate.

    Inspection of a freshly renovated rental apartment
    AI-generated illustrative image

    05Buying a property: use the roadmap in due diligence

    Request any existing iSFP together with the Energieausweis, the energy performance certificate, the Beschlusssammlung recording association resolutions, and current quotations. Treat it as an additional information source, not as a comprehensive building survey or a completed purchase assessment.

    1. Check completeness: Request the report, implementation guidance and explanations rather than only a summary page.
    2. Check dates and assumptions: Have older cost estimates compared with current quotations. Ask which works have since been completed.
    3. Compare it with resolutions: Distinguish proposed, approved, commissioned and already paid-for measures.
    4. Check your actual cost share: Ask which allocation method applies. Do not automatically assume equal shares or rely exclusively on the Miteigentumsanteil, your fractional co-ownership share.
    5. Update the purchase calculation: Compare the purchase price, expected owner contribution and liquidity reserve. Our guide to energy performance ratings and purchase prices provides further context.

    If there is no roadmap, request the remaining records and consider an independent technical assessment. See identifying a renovation backlog for a checklist.

    Consider commissioning—or clarify the outstanding questions first

    Reasons to investigate: Roof, façade or window works are being seriously considered; the association needs a coordinated sequence; financing should be understood before tendering.

    Clarify first: Is there already useful energy advice? Is this only a small individual measure? Is the heating system the sole issue? Are the owners willing to implement anything? Ask for the additional funding benefit to be calculated for the actual project.

    06Risks and limitations

    Separate recommendations from obligations. A roadmap does not guarantee implementation. Ask separately about statutory requirements, necessary association resolutions and detailed design. The official legislation database now identifies the relevant law as the Gebäudemodernisierungsgesetz (GModG); section 36 concerns alterations to existing buildings. This guide does not infer a general obligation to commission an iSFP from that provision.

    Do not anticipate grant approval. The BMWE FAQs document changes effective from 21 July 2026. A roadmap prepared today should therefore not be treated as a promise that funding terms will remain unchanged for later works.

    Recheck costs. Do not use older estimates as a budget without reviewing them. Request current quotations, a defined scope and a contingency appropriate to the actual project.

    Select the adviser carefully. Check the required expert-list registration and ask about experience with comparable apartment buildings. Funding requires the appropriate registration for residential energy advice.

    Conclusion: In the illustrative example, the roadmap costs €1,100 after assumed grants. Its calculated funding advantage depends not only on construction expenditure but also on eligibility, the bonus, application structure and advisory fees. Planning, financing and implementation should support the same decision. As a buyer, have an existing roadmap reviewed before committing to the purchase.

    FAQFrequently asked questions

    What is an individueller Sanierungsfahrplan?

    An iSFP is a building-specific plan for coordinated energy renovation measures or a comprehensive upgrade. It does not replace detailed design or grant approval.

    What does an iSFP cost after funding?

    This depends on the quotation and approved grants. In the expressly illustrative example, a €2,200 total fee leaves €1,100 payable by the owners after assumed grants. This is not a market quotation.

    Can landlords and owners’ associations receive support?

    Yes, they are generally among the eligible applicants for residential energy advice. Building, adviser and application requirements must also be satisfied.

    When does additional funding cover the roadmap cost?

    In the illustrative six-apartment model, break-even is €110,500 of fully eligible expenditure including the assumed bonus, or €112,333.33 excluding it. These are not universal thresholds.

    Can a prospective buyer already budget for the grant?

    Interest in buying should not be treated as established eligibility. Clarify the required acquisition stage, supporting documents and application process before commissioning advice.

    Must the owners implement the roadmap?

    The roadmap alone replaces neither necessary association resolutions nor an assessment of statutory duties. Recommendations, binding requirements and commissioned works should be distinguished.

    Are the costs immediately tax-deductible?

    Immediate full deductibility is not promised. The relationship to acquisition and construction, treatment of grants and timing require an individual German tax assessment.

    07Further reading

    08Sources

    Editorial reference date: 28 October 2026. The funding conditions applicable to each application are decisive.

    General information, not individual tax, legal or investment advice. Funding decisions and tax outcomes depend on individual circumstances. Illustrative fees and calculations are not offers, market forecasts or commitments.

    Written by
    Investment Advisor at InvestImmo

    Writes about Financing and calculations, Taxes and Care properties.

    Michael combines his experience as a banker and former portfolio manager at a family office with his practice as a property investor himself. He writes about robust calculations, financing, risks and strategic portfolio building.

    This guide does not replace tax or legal advice. All figures are example calculations with disclosed assumptions.

    Free · Instant · No sign-up

    Download this guide as a PDF

    The complete guide as a clean A4 file – with a cover page, all chapters and page numbers. Keep it on hand, read it offline, or go through it at your own pace during your consultation.

    • All chapters, tables and worked examples
    • Read offline – on your phone or printed out
    • Go through it at your own pace or pass it on
    • Free, no sign-up, no email required

    A4 format · 2,226 words · As of 03 November 2026

    Related guides

    All guides