Housing construction in 2026: completions, approvals and need
Completions reached a low point in 2025 and approvals are rising again in 2026. We set the official figures against estimated housing need and compare the finances of a new-build and an existing flat.
Anyone letting a flat today often hears that Germany is not building enough homes. Is that true, and how large is the gap really? And does it matter for your individual flat?
Official statistics can describe completions, approvals and the construction backlog. What they cannot show on their own is how rents and prices are developing in your city. We return to that below.
01Completions in 2025: the lowest level since 2012
Each year, the Federal Statistical Office counts how many homes became ready for occupation. According to a May 2026 release, 206,600 homes were completed in 2025, 45,400 fewer than in 2024. This includes 172,600 homes in new residential buildings and 30,700 resulting from alterations to existing buildings.
| Year | Homes completed | Change |
|---|---|---|
| 2023 | around 294,400 | |
| 2024 | around 252,000 | −14.4% |
| 2025 | 206,600 | −18.0% |
A decline was seen across all building types. Completions of homes in blocks of flats fell to 109,800, down 18.9%. For single-family houses, the decline was 23.3%. New construction fell by 34.3% in eastern Germany and 16.7% in western Germany.
Construction of blocks of flats can be particularly relevant to landlords because it also supplies rental homes. These national figures alone do not establish whether the gap between construction and housing need has widened in a particular city.
02Building approvals in 2026: a turnaround in the pipeline
Approvals indicate potential future completions, but do not guarantee construction. Following a low point in 2024, approvals rose by 10.6% to 238,100 in 2025. Figures for 2026 also show an increase compared with the same period a year earlier.
| Homes | Compared with the same period a year earlier | |
|---|---|---|
| Total | 169,400 | +12.1% |
| of which in new residential buildings | 137,500 | +12.7% |
| of which in blocks of flats | 90,600 | +14.5% |
| of which in single-family houses | 31,500 | +7.8% |
| Alterations to existing buildings | 29,100 | +10.1% |
A simple linear extrapolation of the January–August monthly average gives 169,400 ÷ 8 × 12 = 254,100 approvals, or roughly 250,000 for 2026. This ignores seasonality and subsequent revisions; it does not extrapolate the 12.1% growth rate. The result would exceed the 238,100 for 2025 but remain below the annual housing need benchmark. And an approval is not yet a tenancy agreement.

03The construction backlog: approved does not mean built
At the end of 2025, 760,700 homes had been approved but not completed. The statistical office calls this the construction backlog [Bauüberhang].
For residential buildings completed in 2025, the average time between approval and completion was 27 months. In 2025, 35,700 approvals expired, the highest figure since 2002. An expired approval cannot simply be implemented; this does not rule out a new approval at a later date.
04Housing need: 320,000 homes a year
The BBSR calculated an annual need of around 320,000 homes up to 2030 for the Federal Ministry for Housing, Urban Development and Building in March 2025.
There is an uneven regional distribution: the seven largest cities account for around 60,000 homes a year. The national average is 38 homes per 10,000 residents, compared with 87 in Landshut, 83 in Regensburg and 74 in Munich. In areas with shrinking populations, demand may fall and vacancy levels may rise; household sizes and local developments also matter.
Comparing the annual benchmark of 320,000 with completions produces a difference of 113,400 homes for 2025. Across 2023 to 2025, the differences total 207,000, almost two-thirds of that annual benchmark. This is an arithmetic comparison, not an independently established cumulative housing shortage. In particular, the forecast may already include unmet need from earlier years.
05Three scenarios for 2026
The number of completions in 2026 is not yet known. The figures will be released around May 2027. The following figures are assumptions. They simply show how the arithmetic difference changes at different completion levels.
| Scenario (assumption) | Completions in 2026 | Shortfall against a need of 320,000 |
|---|---|---|
| Further decline | 190,000 | 130,000 |
| Broadly unchanged | 210,000 | 110,000 |
| Recovery | 240,000 | 80,000 |
Even the highest of these three assumed completion totals leaves a difference of 80,000 homes. How many additional homes would actually be required to reduce an accumulated shortage depends on changing housing need and how much unmet need is already included in the forecast. This table alone does not establish an additional construction target above 320,000.

06What the shortage means for your calculations
Limited supply can support lettability where local demand exists, particularly in growing regions. It is no substitute for doing the sums. What matters for your flat is the purchase price, current rent, interest rate and costs. New-build and existing properties can differ considerably on these measures.
Ms Hoffmann, who is employed, single and has taxable income of €60,000 before the property example, compares two flats of 55 m² in the same city. The new-build costs €5,200/m², with assumed monthly rent excluding service charges [Kaltmiete] of €14/m². The existing flat costs €3,000/m², with monthly rent excluding service charges of €10/m². She borrows the full purchase price in each case at 3.8% interest and pays the purchase costs from her own funds. The simplified annual model applies both 3.8% interest and 2% principal repayment to the original loan amount. It does not reproduce a monthly repayment schedule for an annuity loan. The name and figures are fictional illustrations, not market offers or forecasts.
| New-build €286,000 | Existing property €165,000 | |
|---|---|---|
| Rent excluding service charges | €9,240 | €6,600 |
| Interest at 3.8% of initial loan | −€10,868 | −€6,270 |
| Principal repayment at 2% of initial loan | −€5,720 | −€3,300 |
| Running costs not recoverable from tenants (assumption) | −€924 | −€990 |
| Cash flow before tax | −€8,272 | −€3,960 |
| Tax depreciation [Absetzung für Abnutzung], assuming eligibility | €13,127 (5% declining balance) | €2,904 (2% straight line) |
| Tax saving (2026 schedule, single person) | +€5,624 | +€1,353 |
| Result after tax | −€2,648 | −€2,607 |
| Monthly result after tax | −€221 | −€217 |
The model assumes full receipt of rent and includes no additional contributions to the owners' association maintenance reserve [WEG-Erhaltungsrücklage]. For a tax calculation, the running costs would need to be substantiated individually as deductible expenses. Contributions to the maintenance reserve are not immediately tax-deductible; only actual expenditure qualifying for tax relief can be taken into account. Nor is the entire owners' service charge [Hausgeld] automatically deductible. Principal repayment is a cash outflow, not a deductible rental expense; depreciation, by contrast, is not a recurring cash outflow.
Before tax, the simplified model requires a monthly cash contribution of approximately €689 for the new-build and €330 for the existing flat.
For declining-balance depreciation under section 7(5a) of the German Income Tax Act, construction and acquisition must be considered separately. For construction, one relevant condition is the legally defined start of construction after 30 September 2023 and before 1 October 2029. For acquisition, relevant conditions include a legally binding purchase contract within that window and acquisition by the end of the year of completion. This is not a complete eligibility assessment. Whether 5% declining-balance, 3% straight-line or, for the existing flat, 2% straight-line depreciation applies must be established for the particular building.
The calculation initially shows a higher financing requirement at the assumed new-build purchase price. That price is approximately 31 times annual rent excluding service charges, before purchase costs. It does not establish that limited construction activity alone causes high new-build prices. Depreciation can affect the tax burden, but the amount and timing of relief require separate assessment. Financing must accommodate the ongoing cash requirement. Modelled annual principal repayment is €5,720 for the new-build and €3,300 for the existing flat. Read more in our guide to new-build or existing investment property.
Run the numbers using your own purchase, financing and cost data. Have tax assumptions for any after-tax calculation reviewed by qualified tax advisers.
07Who these figures matter to most
- You let or buy property in a major city or growing region.
- You are considering buying a new-build flat from a developer.
- You plan to hold the property for a long time and want to assess demand.
- You are buying in an area with a declining population, where local vacancy levels may matter more.
- Your flat has a low current rent that you have little legal scope to increase.
- You want to sell in a few years, when interest rates and the achievable sale price may be particularly important.
08Risks and limitations of the figures
National figures tell you little about your street. A national difference establishes neither a particular local shortage nor its concentration in major cities or southern Germany. Vacancy rates in many eastern German districts are higher than the 2022 Census national rate of 4.3%. Local oversupply can exist despite a national shortage.
Scarcity does not automatically mean higher rents. Where applicable, Germany's restriction on rents at the start of a tenancy [Mietpreisbremse] and percentage cap on increases during an existing tenancy [Kappungsgrenze] can limit rents or rent increases. A local rent index [Mietspiegel] helps establish the local comparable rent; it is not itself a universal rent ceiling. Tenants' ability to pay also sets limits. Our guide to rental price trends discusses past rent developments.
New-build property carries its own risks. These include construction delays, developer insolvency and interest on undrawn loan funds [Bereitstellungszinsen]. Rent only starts once the flat can be handed over and let; years may pass between the purchase contract and the start of rental income.
Housing needs forecasts depend on assumptions. Different assumptions about immigration, household sizes and bringing vacant homes back into use can produce higher or lower estimates. The stated 320,000 is a forecast value, not a fixed quantity.
Tax rules can change. Declining-balance depreciation is subject to timing and other conditions. Assess new-build offers using straight-line depreciation where applicable as well; changing the depreciation assumption is no substitute for checking the tax schedule and deductible expenses.
FAQFrequently asked questions
How many homes were built in Germany in 2025?
Around 206,600 homes were completed in 2025, 18.0% fewer than in 2024 and the lowest figure since 2012. Some 172,600 of these were in new residential buildings.
How many homes are needed each year?
The Federal Institute for Research on Building, Urban Affairs and Spatial Development (BBSR) estimates need at around 320,000 homes annually for 2023 to 2030, taking account of additional households, replacement need, unmet need from earlier years and a deduction for vacant homes.
How are building approvals developing in 2026?
For January to August 2026, around 169,400 homes were approved, up 12.1% on the same period a year earlier. Homes in blocks of flats rose by 14.5%.
What is the construction backlog?
It consists of approved homes that have not yet been completed. At the end of 2025, the construction backlog stood at around 760,700 homes.
Does the housing shortage cause rents to rise?
Not necessarily. Limited supply can support lettability where local demand exists. Where applicable, German restrictions on initial rents and caps on increases during existing tenancies limit rents or rent increases. Tenants' ability to pay and local vacancy levels also matter.
How long does it take from approval to a completed home?
For residential buildings completed in 2025, it took an average of around 27 months from approval to completion. A retrospective average cannot provide a firm forecast of when homes approved in 2026 will be completed.
09Further reading
- [Accelerated housing approvals (section 246e of the German Building Code [Baugesetzbuch])](/en/guides/bau-turbo)
- New-build or existing investment property
- [Special depreciation allowances [Sonder-AfA] and declining-balance depreciation](/en/guides/sonder-afa-degressive-afa)
- Rental price trends
- Data: construction price index
- Calculator: property cash flow
10Sources
- Federal Statistical Office, press release no. 174 of 22 May 2026 (housing completions in 2025, construction backlog)
- Federal Statistical Office, press release no. 370 of 16 October 2026 (building approvals in August 2026)
- Federal Statistical Office, press release no. 052 of 18 February 2026 (building approvals in 2025)
- Federal Statistical Office, press release no. 250 of 16 July 2026 (housing stock at the end of 2025)
- Federal Institute for Research on Building, Urban Affairs and Spatial Development, housing needs forecast to 2030, published on 20 March 2025
- 2022 Census, German housing vacancy rate: 4.3%
- Section 7 of the German Income Tax Act and section 32a
- Illustrative calculations: own calculation, as at 19 October 2026
Note: This guide provides general information and is not a substitute for tax, legal or investment advice tailored to individual circumstances. Scenarios and illustrative calculations use the stated assumptions and are not forecasts. As at: 19 October 2026.

Writes about Existing properties, Investment calculations and Property assessment.
Rula has worked in financial services since 2021. He focuses on existing investment properties, transparent calculations and an honest assessment of building condition and running costs.
This guide does not replace tax or legal advice. All figures are example calculations with disclosed assumptions.