Section 555a BGB: maintenance works in rented properties
What tenants must allow, how to give notice and the implications of rent reductions, expense reimbursement and special levies.
01Maintenance works: what tenants must allow
The owners’ association approves the replacement of communal pipe risers. Contractors need repeated access to your rented flat, and the bathroom will be unavailable at times. The resolution organises the project within the association – it does not replace arrangements with your tenant.
Under section 535(1) BGB, you must keep the property in a condition suitable for its contractual use. Section 555a BGB requires the tenant to allow the necessary works. Examples include:
- replacing damaged water and wastewater pipes;
- repairing a leaking roof;
- remedying water damage;
- replacing defective windows with equivalent windows;
- necessary servicing of the heating system.
The tenant must provide necessary access at reasonably coordinated times. They do not, however, have to carry out the repairs themselves. Agree any necessary preparations specifically rather than making blanket demands for unpaid assistance.
02Maintenance or modernisation?
The purpose and effect of the works matter, not the wording of the resolution or quotation. A new heating system, for example, is not automatically classed entirely as modernisation: replacing a defective system may also include a maintenance element.
| Point | Maintenance and repairs | Modernisation |
|---|---|---|
| Purpose | Maintain or restore the property's condition | An improvement recognised under section 555b BGB |
| Notice | Timely notice; no specific statutory form | Generally at least three months before work starts, in text form under section 555c BGB |
| Hardship objection | No specific hardship procedure equivalent to modernisation; general legal limits still apply | A hardship objection under section 555d BGB is possible |
| Special termination right | No specific right under section 555e BGB | Generally a special termination right under section 555e BGB |
| Rent increase because of the works | No modernisation-related increase for maintenance alone | Subject to statutory requirements; maintenance elements must be accounted for |
| Rent reduction | Generally possible where use is significantly restricted | Generally possible; a limited exception applies to energy-efficiency modernisation |
Minor modernisation projects are subject to exceptions to the notice requirements. For mixed projects, separate the maintenance and modernisation elements transparently. This matters both for notice and for any subsequent rent increase. See the guide to modernisation-related rent increases.

03Give timely notice of maintenance works
Section 555a(2) BGB does not specify a fixed notice period. The necessary lead time depends on the scope, urgency and impact of the works. Tenants need considerably more preparation for several weeks of bathroom works than for a short servicing appointment.
Notice is exceptionally unnecessary if the measure has only an insignificant impact on the property or must necessarily be carried out immediately. This does not create a general right to enter the flat without warning.
What the notice should contain
- Works and reason: What will be done, and why is it necessary?
- Schedule: Planned start, expected duration and appointments requiring access.
- Disruption: When will water, the bathroom, kitchen or individual rooms be unavailable?
- Preparation: Which access routes must be clear, and who will move or cover items where necessary?
- Coordination: Contact details for appointment changes and urgent problems.
- Tenant expenses: Arrangements for reimbursement of reasonable expenses and any necessary advance.
Use a communication method you can document and, where possible, retain evidence of receipt. Sending an email alone does not reliably prove receipt. Agree reasonable appointment windows and communicate changes promptly.
04Treat rent reductions and expense reimbursement separately
Rent reductions reflect restricted use
Where the property's contractual use is impaired to more than an insignificant degree, the rent is generally reduced by operation of law under section 536 BGB. The landlord's agreement is not required. The amount depends on the intensity and duration of the disruption; there is no fixed percentage for every pipe-riser replacement project.
The calculation is generally based on the total rent, including agreed service-charge advances or flat-rate service charges. The rent reduction table provides guidance but cannot replace an assessment of the individual case.
The three-month exclusion of rent reductions under section 536(1a) BGB applies only insofar as the disruption results from energy-efficiency modernisation under section 555b no. 1 BGB. It does not cover every construction project or heating-system replacement indiscriminately.
Expense reimbursement covers additional spending
Under section 555a(3) BGB, you must reimburse reasonable expenses incurred by the tenant because of the maintenance works. An advance must be provided on request. Potential examples include:
- necessary cleaning after the works;
- necessary storage of furniture elsewhere;
- electricity used by drying equipment;
- reasonable alternative accommodation where necessary.
Not every expense the tenant wishes to incur is automatically reimbursable. Where possible, agree necessity, scope and supporting evidence in advance. Rent reductions and expense reimbursement can apply alongside each other, but must not compensate for the same item twice.
Specific agreements rather than blanket waivers
Section 555f BGB permits agreements relating to specific maintenance projects, for example on scheduling, rights relating to defects and expense reimbursement. An agreement should identify the expected disruption, the claims covered and what happens if disruption lasts longer or becomes more severe.
A lump sum is not automatically cheaper or legally safer. Where the scope is uncertain, reimbursement of actual expenses may be more suitable. General contractual clauses must not amend the protections in section 555a BGB to the tenant's disadvantage.
05If the tenant refuses access
First check that the works are necessary, proper notice has been given and the appointments are reasonable. Not every cancellation is a breach of duty.
If the tenant refuses access they are legally required to provide, you may seek a court order requiring them to allow the works and, where sufficiently urgent, interim relief. Additional costs can be recovered only if the requirements for a damages claim are met, particularly a culpable breach of duty and demonstrable causation.
Do not enter on your own authority: Possessing a key does not entitle you to enter against the tenant's wishes. Only a specific, acute emergency may justify narrowly limited emergency measures. Where there is immediate danger, contact the fire service or other appropriate emergency services if necessary.
06Worked example: cash flow during pipe-riser replacement
The following figures are assumptions only, not market data, prescribed rent reduction percentages or cost commitments. The example covers a full rental year, with no sale or change in property value.
A rented flat has a floor area of 70 m². Monthly rent excluding service charges is €800, with a €200 service-charge advance. The owner's share of a special levy is €18,000. Works disrupt bathroom use for four weeks.
In scenario A, the parties agree a €400 rent reduction and €100 expense reimbursement for the period considered. Scenario B also assumes a €400 rent reduction, but €600 in reasonable expense reimbursement. The landlord additionally bears assumed contractor downtime costs of €900 and legal fees of €500. No right to recover these costs from the tenant is assumed. These differences are modelling assumptions, not inevitable consequences of failing to reach an agreement.
A €200,000 loan is assumed to carry 3.8% interest and 1.5% principal repayment. For simplicity, payment takes place at year-end, resulting in €7,600 interest and €3,000 principal repayment. This is not a financing offer.
| Item during the rental year | A: coordinated works | B: additional expenses |
|---|---|---|
| Annual rent excluding service charges before reduction: €800 × 12 | €9,600 | €9,600 |
| Rent reduction | −€400 | −€400 |
| Payment of special levy | −€18,000 | −€18,000 |
| Expense reimbursement | −€100 | −€600 |
| Contractor downtime and legal fees | €0 | −€1,400 |
| Interest | −€7,600 | −€7,600 |
| Principal repayment | −€3,000 | −€3,000 |
| Other ongoing costs not recoverable from the tenant | −€1,000 | −€1,000 |
| Cash flow before tax | −€20,500 | −€22,400 |
| Rental result for tax purposes under the assumptions below | −€21,500 | −€23,400 |
Service-charge advances and the corresponding expenditure are excluded as equal offsetting amounts; the entire rent reduction is accounted for separately. Other costs are assumed to be zero. They must be added for an actual property.
The tax calculation additionally assumes €4,000 in building depreciation, ongoing expenses wholly related to letting and immediately deductible, and actual spending of the entire special levy on immediately deductible maintenance works in the same year. The other ongoing costs do not include mere contributions to a maintenance reserve.
The calculation is: cash flow + €3,000 principal repayment − €4,000 depreciation = rental result for tax purposes. Principal repayment is not a deductible rental expense; depreciation is not a cash payment in the year considered.
Scenario B places an additional €1,900 burden on cash flow before tax. The actual tax effect depends on factors including personal income, the ability to offset losses and the timing of deductions. A tax loss does not produce a refund of the same amount.

07Special levies: when costs affect tax
For a rented flat within an owners’ association, paying money to the association does not automatically create an immediate deduction against rental income. In particular, payments into the maintenance reserve generally become deductible only when the association actually spends the funds on tax-deductible maintenance works. For special levies too, the use of the funds and the timing of expenditure are decisive. Obtain a clear breakdown from the management records.
Immediate deduction or spreading the expense
Where expenditure qualifies as maintenance for tax purposes, a deduction against rental income is generally possible. Larger maintenance expenses on privately held buildings used predominantly for residential purposes can be spread evenly over two to five years under section 82b of the German Income Tax Implementing Regulation (EStDV).
Whether spreading the expense is more favourable depends on changes in your income and other circumstances. It does not guarantee a greater tax saving. Read more in spreading maintenance expenditure.
The 15% threshold after purchase
If certain repair and modernisation expenses incurred within three years of acquisition, excluding VAT, exceed 15% of the building's acquisition cost, they may qualify as acquisition-related production costs under section 6(1) no. 1a of the German Income Tax Act (EStG). The relevant figure is the building element, not the total purchase price including land.
The costs covered are then generally deducted through depreciation rather than immediately. Statutory exceptions and the distinction from other capital expenditure require separate consideration. Even below the threshold, not every building project is immediately deductible.
08Checklist for landlords
- Establish necessity and distinguish maintenance from modernisation.
- Coordinate the owners’ association's schedule and access to the flat early.
- Give specific notice of works, appointments and disruption.
- Budget separately for rent reductions and reasonable tenant expenses.
- Address delays and additional disruption in any agreement.
- Keep funds available for the special levy and additional costs.
- Document actual use of the funds and their tax treatment.
Further information is available in the guides to pipe-riser replacement and landlords’ rights and responsibilities.
As at October 2026. This guide provides general information and does not replace individual legal or tax advice.
09Free initial consultation
In a free initial consultation, we discuss how planned maintenance works and special levies can fit into the cash-flow planning for your investment property. Individual legal and tax questions should be addressed by the relevant professional adviser.
Arrange a free initial consultation
FAQFrequently asked questions
What does section 555a BGB regulate?
Section 555a of the German Civil Code requires tenants to allow necessary maintenance and repair works. Landlords must generally give timely notice and reimburse reasonable expenses the tenant incurs as a result. An advance must be provided on request.
Must the tenant let contractors into the flat?
The tenant must generally provide access for necessary maintenance works. Proper notice must be given and appointments must be reasonably coordinated. If access is unjustifiably refused, the landlord can seek court assistance; entering on the landlord's own authority is generally unlawful.
How much notice is required for maintenance works?
The law does not specify a fixed period. The lead time must allow the tenant to prepare for the scope and impact of the works. Notice is unnecessary if the measure has only an insignificant impact on the property or must necessarily be carried out immediately.
Can the tenant reduce the rent during the works?
Where contractual use is impaired to more than an insignificant degree, the rent is generally reduced by operation of law. The amount and duration depend on the individual case. The three-month exclusion of rent reductions applies only to disruption caused by energy-efficiency modernisation under section 555b no. 1 BGB, not to maintenance alone.
Can the landlord increase the rent after maintenance works?
Maintenance alone does not justify a modernisation-related rent increase. Maintenance elements must be accounted for in mixed projects. Other legally permitted rent increases, such as an increase up to the local comparable rent, remain possible if their own requirements are met.
When is a special levy for pipe-riser replacement tax-deductible?
Payment to the owners’ association alone does not create an immediate deduction against rental income. Actual expenditure by the association and the tax classification of the works are particularly important. Deductible maintenance expenses can be spread over two to five years if the requirements of section 82b EStDV are met. Following an acquisition, the rules on acquisition-related production costs must also be considered.

Writes about Purchase process, Notary and land registry and Letting.
Kevin combines twelve years of sales experience with nine years specialising in property and more than 500 consultations. He writes about property quality, location risks and a safe path from the first comparison to completion.
This guide does not replace tax or legal advice. All figures are example calculations with disclosed assumptions.