    New-build defect liability at a glance
    5 years
    General limitation period for building defects
    from valid acceptance; note the relevant dates for the flat and common property
    3 months
    Earliest expiry of limitation
    after the suspension resulting from negotiations ends (§ 203 BGB)
    −€8,000
    Share of remedial work
    in the example where the limitation defence succeeds
    +€2,800
    Tax relief in the simplified example
    assuming an immediate deduction of €8,000 and a tax relief rate of 35%

    In February, your tenant calls. The wall below the bedroom window is damp. The flat is three and a half years old, bought from a developer [Bauträger], and you vaguely remember five years of statutory defect liability [Gewährleistung]. Is a phone call to the developer enough?

    A phone call can constitute a valid defect notification, but it is difficult to prove later and does not, by itself, suspend limitation. Claims can become difficult to enforce if deadlines pass unnoticed, notifications cannot be evidenced or responsibility for the underground car park remains unclear.

    01What statutory defect liability means for a new build

    Under a developer contract, construction of the building is generally governed by German law on contracts for work [Werkvertragsrecht] (§ 650u BGB). The developer owes you work free from defects. The five-year period concerns claims for defective contractual performance, not every problem arising within five years. After acceptance, you generally have to establish that the relevant defect existed at acceptance, even if it only became visible later. Section 634 BGB provides the following rights:

    RightWhat it meansWhen
    Remedial performance [Nacherfüllung]The developer remedies the defect at its own expense.generally takes priority; statutory exceptions may apply
    Arranging rectification yourself [Selbstvornahme]You arrange repairs and recover the necessary costs, including requesting an advance (§ 637 BGB).generally after a reasonable deadline passes without success; further requirements and exceptions apply
    Price reduction [Minderung] or withdrawal from the contract [Rücktritt]The purchase price is reduced; sufficiently substantial defects may justify reversing the transaction.generally after an unsuccessful deadline and subject to further requirements
    Damages [Schadensersatz]Compensation for recoverable losses, such as lost rent or necessary expert fees.in particular where the developer is legally responsible; additional requirements depend on the type of loss

    Statutory defect liability is not a guarantee. A guarantee would be a voluntary promise with its own conditions. A developer cannot simply exclude statutory defect rights when selling to consumers. By contrast, a purchase of an existing property may include an exclusion of liability for defects.

    02When the limitation period starts and ends

    The five years generally start on valid acceptance, not at the notarial appointment or when the tenant moves in. This makes the acceptance record an important document for your deadline calendar. For common property, do not assume that one acceptance date applies to every purchaser without checking.

    AreaLimitation periodStart
    Your flat (individually owned property [Sondereigentum])generally five years for building defectsacceptance of the flat that is valid for your contract
    Roof, façade, stairwell, underground car park (common property)generally five years for building defectsacceptance of the common property that is valid for your contract; this may differ from the flat’s acceptance
    Fraudulently concealed defectstandard three-year limitation period; for building defects, not before the five-year period expiresgenerally the end of the year in which the claim arose and the creditor knew, or was grossly negligent in not knowing, the relevant circumstances and the debtor’s identity
    Separate work by tradespeople, such as a kitchen supplied by a kitchen specialistdepending on the contract and work, for example two or five yearsacceptance or delivery, depending on the contract; check separately

    Enter the relevant acceptance dates in your calendar straight away. Set a reminder six months before each period expires. This is a suitable time for a thorough inspection. Limitation does not automatically extinguish the claim, but it can give the developer the right to refuse performance.

    Inspection documents and apartment keys in a bright rental apartment
    AI-generated illustrative image

    03How to notify the developer of defects properly

    Report a defect in a way that enables the developer to identify it and allows you to prove the notification’s content and receipt later. This is known as a notice of defects [Mängelrüge].

    How to report a defect
    1. 01
      Describe the symptom, not the cause

      Write down what you can see: “Damp patch, approximately 40 × 30 cm, below the bedroom window, growing since January.” You generally do not have to provide a technical diagnosis. A sufficiently specific description of the symptoms generally covers their underlying causes.

    2. 02
      Use writing and retain evidence

      Keep the notification and dated photographs, and document receipt through an appropriate delivery method or an express acknowledgement. Registered post and email read receipts do not automatically prove every relevant fact. A telephone notification may be valid but is harder to evidence.

    3. 03
      Set a deadline

      Request rectification and set a reasonable deadline, generally for completing the remedial work, not merely starting it. Its length depends on urgency, scope and technical feasibility; two to four weeks is not a universal rule.

    4. 04
      Arrange access

      For rented flats, give the tenant timely notice of appointments. The tenant must allow necessary maintenance measures subject to the statutory requirements (§ 555a BGB).

    5. 05
      Document the response

      Record every reply, appointment and delay. You will need this documentation if time becomes tight.

    6. 06
      Act after the deadline

      Once a reasonable deadline has passed without success, arranging repairs yourself and claiming reimbursement or an advance may be possible under § 637 BGB. Clarify the requirements and preservation of evidence with a lawyer before commissioning work, and consult an expert on technical questions.

    04Suspending the limitation period: notification is not enough

    Written notification of a defect alone does not protect the claim against limitation. It calls on the developer to act, but the limitation clock generally keeps running.

    Three important ways of suspending limitation are:

    Negotiations. While you and the developer negotiate about the claim or its underlying circumstances, limitation may be suspended. The limitation period expires no earlier than three months after the suspension ends (§ 203 BGB). If the developer sends an expert, investigates and writes back, this may indicate negotiations. Whether and when negotiations end or lapse depends on the course of events; do not assume that silence means suspension continues.

    Independent court proceedings to preserve evidence [selbständiges Beweisverfahren]. A court can appoint an expert to establish the condition, causes and remedial costs of a defect. Service of the application can suspend limitation for the claims covered (§ 204(1) BGB). Subject to statutory conditions, the effect can relate back to filing if service follows sufficiently promptly. Do not therefore rely on filing alone. This procedure may be appropriate when the deadline is approaching and the developer is not cooperating.

    Legal action. An action for rectification or an advance towards costs can also suspend limitation. The scope of the claim, timely service and any retrospective effect of service must be considered.

    These routes are not exhaustive. An acknowledgement can restart the limitation period where the statutory requirements are met; this differs from suspension.

    05Common property: who takes responsibility

    For defects in the roof, façade or underground car park, individual purchasers’ claims and collective action need to be coordinated. Within its powers, the community of property owners [Eigentümergemeinschaft] can pass a resolution organising the collective pursuit of defect rights and appoint a lawyer and an expert. Clarify with a lawyer which claims it can exercise. Individual owners should not assume without checking that their own limitation periods are protected as a result.

    If the first property manager is connected with the developer or was proposed by it, conflicts of interest may arise. Clarify responsibilities and have the relevant limitation periods documented at the owners’ meeting.

    Inspection of the shared heating system in an apartment building
    AI-generated illustrative image

    06Worked example: the damp underground car park

    Claudia owns a rented new-build flat in a building with 20 flats. Her co-ownership share [Miteigentumsanteil] is 50/1,000. In the fourth year after acceptance, damp patches appear on the underground car park ceiling. An expert estimates that repairing the waterproofing will cost €160,000. Claudia is a fictional owner; all amounts are assumptions for a simplified illustrative calculation, not a forecast.

    The comparison uses two simplified scenarios. In the first, an enforceable defect claim exists and is protected in time, and a financially capable developer pays for all the remedial work. In the second, the limitation defence succeeds and the community bears the costs. Claudia’s allocation is assumed to follow co-ownership shares. Timely action alone guarantees neither liability nor payment.

    Claudia’s share of the remedial work
    Claims protected and enforcedLimitation defence succeeds
    Cost of remedial work for the building€160,000€160,000
    Who pays, under the model assumptionsDeveloperCommunity of property owners
    Claudia’s share (50/1,000) before tax€0−€8,000
    Tax relief assuming immediately deductible maintenance expenditure and a tax relief rate of 35%€0+€2,800
    Cost after tax in the simplified example€0−€5,200
    Simplified illustrative calculation: €8,000 × 35% = €2,800; €8,000 − €2,800 = €5,200. The 35% relief rate is purely an assumption for the calculation, not a statutory tax rate or a calculation using the income tax tariff. The expenditure is assumed to be fully attributable to letting for tax purposes and immediately deductible as maintenance expenditure. Excludes legal and expert fees.

    Before tax, Claudia’s share is €160,000 × 50/1,000 = €8,000. Whether and when she can deduct this as expenses incurred in earning rental income [Werbungskosten] depends, among other things, on the tax classification of the work and the actual use of the funds. Calling work “remedial work” does not establish immediate deductibility as maintenance expenditure [Erhaltungsaufwand]; capitalisation may be required.

    Paying a special levy [Sonderumlage] or contributing to the community’s maintenance reserve [Erhaltungsrücklage] does not, by itself, create an immediate tax deduction. What matters is the community’s actual use of the funds for tax-deductible expenditure and its correct allocation. Nor are owners’ regular building charges [Hausgeld] automatically deductible in full. In the simplified example, the assumed tax relief reduces the cost from €8,000 to €5,200. The actual relief, however, depends on Claudia’s personal tax circumstances and the timing of the deduction. A special levy may require cash at short notice regardless of any later tax effect. Ask your tax adviser to clarify the classification and timing of the deduction.

    And what about the flat itself? Suppose the bedroom window was leaking. A separate simplified illustrative calculation assumes a rent reduction of 10% over four months, monthly rent excluding service charges [Kaltmiete] of €845 and advance service-charge payments of €155. Total monthly rent is therefore €1,000. At the assumed percentage, the reduction is €1,000 × 10% × 4 = €400. Of this, €845 × 10% × 4 = €338 is attributable to rent excluding service charges and €155 × 10% × 4 = €62 to the advance service-charge payments.

    The calculation basis for a rent reduction is generally total rent including service-charge payments. The 10% reduction is purely an assumption here; the legally appropriate reduction depends on the actual defect and its impact. Claudia may claim recoverable lost rent from the developer subject to the statutory requirements, in particular where the developer is legally responsible for the defect. In a dispute, ask a lawyer to assess the extent of the rent reduction and any compensation claims.

    Pre-tax amounts and partial calculation in the example
    Share of remedial work before tax
    −€8,000
    Calculated reduction component on rent excluding service charges only, four months
    −€338
    The window calculation is a separate, simplified example; these amounts do not form a combined total loss. The €338 component attributable to rent excluding service charges is part of the illustrative total rent reduction of €400, including advance service-charge payments. All rent-reduction amounts use the assumed rate of 10%. The limitation period for any compensation claim must be considered separately and the claim protected in time.

    The calculation shows two things. Common property can create substantial financial risks even where an owner’s share appears small. Potential tax relief replaces neither protection of claims nor the necessary cash reserves, and does not automatically make good a loss.

    07What you can do yourself and when to get help

    You can handle these yourself
    • Report minor defects in your flat in writing and set a reasonable deadline for rectification.
    • Keep a deadline calendar for the flat and common property based on the relevant acceptances.
    • Inform tenants and coordinate appointments.
    Bring in professionals
    • The developer is not responding and the end of the five years is approaching.
    • The defect affects common property and involves substantial costs.
    • The cause is unclear, for example with damp, cracks or sound insulation problems.

    08Risks: when statutory defect liability does not help

    The developer no longer exists. A developer may operate through a separate project company. If it is dissolved or becomes insolvent after completion, enforcing your claims may become significantly harder or yield no financial recovery. The guide Developer insolvency explains what to consider before buying.

    The limitation period expires unnoticed. This can happen particularly with common property if responsibilities and individual deadlines remain unclear.

    The defect is difficult to prove. After acceptance, you generally have to establish defective performance at acceptance. Photographs, records and expert reports can help.

    Wear and tear is not a construction defect. Ordinary wear, damage caused solely by a lack of maintenance and tenant damage generally do not establish defect claims against the developer. They do not, however, automatically exclude a separate construction defect. Follow maintenance intervals for heating, ventilation and smoke alarms, and document the work.

    You still end up bearing the costs. Recovery of lost rent during remedial work and other consequential costs depends on entitlement, evidence and enforceability. Your own time and inconvenience are not automatically compensable. Maintenance remains a cost factor for new builds and should be budgeted for from the outset.

    FAQFrequently asked questions

    How long does statutory defect liability last for a new build?

    Building defect claims generally become time-barred five years after valid acceptance [Abnahme] (§ 634a BGB). Different dates may apply to the flat and common property [Gemeinschaftseigentum]. The acceptances valid for your contract are decisive; the period is not a guarantee against every subsequent problem.

    Is notifying the developer of a defect enough to stop limitation?

    No. Notification alone does not suspend limitation. Negotiations or certain court procedures can do so (§§ 203, 204 BGB). For legal actions and independent evidence proceedings, service, the claims covered and any retrospective effect are particularly important. Do not rely on filing alone, and ask a lawyer to clarify the necessary steps in good time.

    What must a notice of defects contain?

    Describe the visible symptom accurately, including its location, the date and, where possible, photographs. Request rectification and set a reasonable deadline, generally for completing the remedial work. You do not normally have to identify the technical cause. Document the content and receipt.

    What happens if the developer does not remedy the defect?

    After a reasonable deadline passes without success, arranging repairs yourself and claiming reimbursement or an advance may be possible under the statutory requirements (§ 637 BGB). A price reduction or damages may also be available. Exceptions to the deadline requirement can apply. Clarify the requirements and preservation of evidence with a lawyer before commissioning work.

    Who deals with defects in the common property?

    Within its powers, the community of property owners [Eigentümergemeinschaft] can resolve to pursue claims collectively and appoint a lawyer and an expert through the property manager. Individual claims and deadlines must be considered. Costs are generally allocated according to co-ownership shares unless another valid allocation rule applies.

    Does statutory defect liability still apply if I have rented out the flat?

    Yes. Letting the flat does not remove your defect rights against the developer. Your tenant deals with you and may reduce the rent where the statutory requirements are met. The tenant must allow necessary maintenance measures subject to the statutory requirements.

    Can the developer shorten the statutory defect liability period?

    In a standard-form contract with a consumer, a developer generally cannot validly shorten the statutory limitation period for building defects. Nevertheless, have a lawyer check the contract before the notarial appointment. Further guidance is available in “Checking a developer contract”.

    09Further reading

    10Sources

    • § 634 BGB (rights in the event of defects) and § 634a BGB (limitation periods)
    • § 637 BGB (arranging rectification yourself)
    • § 203 BGB and § 204 BGB (suspension of limitation periods)
    • § 555a BGB (maintenance measures in rented flats)
    • § 650u BGB (developer contracts)
    • § 309 BGB, no. 8(b)(ff) (no shortening of limitation periods for building defects in standard-form consumer contracts)
    • Illustrative calculations: own calculations using expressly assumed remedial costs, co-ownership shares, tax relief rate, rental amounts and rent-reduction percentage.

    This guide provides general information and does not replace legal, tax or investment advice for individual circumstances. The calculations use simplified assumptions. Discuss your legal and tax position with a lawyer or tax adviser, respectively.

    Written by
    Investment Advisor at InvestImmo

    Writes about Existing properties, Investment calculations and Property assessment.

    Rula has worked in financial services since 2021. He focuses on existing investment properties, transparent calculations and an honest assessment of building condition and running costs.

    This guide does not replace tax or legal advice. All figures are example calculations with disclosed assumptions.

    Free · Instant · No sign-up

    Download this guide as a PDF

    The complete guide as a clean A4 file – with a cover page, all chapters and page numbers. Keep it on hand, read it offline, or go through it at your own pace during your consultation.

    • All chapters, tables and worked examples
    • Read offline – on your phone or printed out
    • Go through it at your own pace or pass it on
    • Free, no sign-up, no email required

    A4 format · 3,335 words · As of 19 October 2026

    Related guides

    All guides